Hooray! My film the Wedding has been completed, now I need to sit on it and work out what I can do with it regarding film festivals and the like.
We have to present our work and demo reels and stuff immediately after finishing it, so here is a kinda goofy demo reel I busted together in a semi delirious sleep deprived state. It cracks me up so I'm happy!
Monday, October 31, 2011
Friday, October 28, 2011
the wedding post pro
Here is two post comp tests. I think I will go for a mix of the two, as the second is a bit too digital for me, I don't think I will use the Depth of Field either.
Sunday, October 23, 2011
The Wedding Colouring progress
colouring colouring colouring.
I have been working like literally non stop from 10am-3am for 3 days in a row now. I've never worked so hard on something, it's great! I've been home alone for 3 weeks now too so I've gone a little weird, but I'm having so much fun. It's frantic to get this thing finished.
Here is a quick test for my colouring! I'm a bit more than half way through the colouring now thank god. Then it's comp city. I want to do a shading pass, but we will see if I have the time and how quick it will be.
I have been working like literally non stop from 10am-3am for 3 days in a row now. I've never worked so hard on something, it's great! I've been home alone for 3 weeks now too so I've gone a little weird, but I'm having so much fun. It's frantic to get this thing finished.
Here is a quick test for my colouring! I'm a bit more than half way through the colouring now thank god. Then it's comp city. I want to do a shading pass, but we will see if I have the time and how quick it will be.
Thursday, October 20, 2011
The Wedding Colouring
Wednesday, October 19, 2011
The Wedding CLEANS DONE
OH BOY! Huge milestone today. I finished all the animation! Cleans dooone. It took forever jeesus, haha. I've basically been working non stop for 2 weeks now, like from the moment I wake up till sleep.
Now it's time to try implementing the music and start my colouring tomorrow. Only 12 days till the film needs to be completed so it's absolute non stop work madness at the moment. I hope I can finish the colouring by in 4-5 days. God I hope so.
Now it's time to try implementing the music and start my colouring tomorrow. Only 12 days till the film needs to be completed so it's absolute non stop work madness at the moment. I hope I can finish the colouring by in 4-5 days. God I hope so.
Here is a commemorative drawing of all of our uni films, done by my boy Cameron. |
Tuesday, October 11, 2011
The Wedding Update
I am almost finished my cleans, it's been an intense clean journey I will tell you what.
Then I'm onto colouring.
My musician vanished which totally sucks, but luckily I managed to get onto a fantastic French musician who I think will be much better than my original one!
Sound stuff is also going ahead and I had a skype meeting with my radical sound guy Dan Brumm.
Here is a sample image I had to produce for a EPK (electronic press kit).
Then I'm onto colouring.
My musician vanished which totally sucks, but luckily I managed to get onto a fantastic French musician who I think will be much better than my original one!
Sound stuff is also going ahead and I had a skype meeting with my radical sound guy Dan Brumm.
Here is a sample image I had to produce for a EPK (electronic press kit).
The final coulouring style will probably be a bit different, as I'm using TV paint to do it.
This was coloured in Photoshop
This was coloured in Photoshop
Subscribe to:
Posts (Atom)